top of page

AUREUS PRIMARY SCHOOL

Project: AUREUS PRIMARY SCHOOL

Subject: DISPUTE RESOLUTION REPORT

Value: Infrastructure & Earthworks Package Value: £500k

Area: Specialist Commercial & Technical Consultancy Services

Client: Due to the sensitive nature of our work we do not reveal the name of our client

Achievements: Successfully protected and promoted the interests of our client

 

Main deliverables:

  • Settled clients dispute against designer and contractors

  • Earthwork Models Preparations in Software

  • Final Account Assessment with the assessment of all associated change

Work Items

Phase 1

  • Review opposition’s party technical note

  • Interrogate opposition’s party survey and compile associated models

  • Compile additional models that account same conditions with those considered by the opposition party and examine their validity and behaviour.

  • Review existing survey data and compile its model

  • Review Clients as-build drawings and models as required

  • Run all necessary surface comparisons, extract and study results

  • Create isopachyte drawings for all the surface model comparisons – isopachyte drawings to also include grid with +/- clearly measured as required.  

  • Calculate separately the volume of the disputed area and supply all different versions of results based on the available data.

  • Model all ‘’additional Surveys’’ that are held within file and examine whether there are any items of interest

  • Compare ‘’additional Surveys’’ against all other data

  • Extract, Study and Explain all relevant results

  • Write Technical Note with Recommendations

Phase 2

  • Calculate full Cut and Fill volume and compile all relevant drawings and models to support clients’ position

  • Compile Report that Responds to Opposition Party in support of Clients position

  • Agree and settle the dispute

bottom of page